|
|
|
|
| |
 |
 |
| ¡¤ |
The system receives data from various DCS(Distributed Control
System) and SCADA(Supervisory Control And Data Acquisition) system and enables
stable and efficient operation of clear water facilities using; wide range
clear water facility system simulation and realtime network analysis through
the establishment of pipeline network data from water intake up to water
drainage for water treatment; demand forecasting based on seasonal and historical
data and land operation plan in consideration of capacity of water drainage
pool; and water intake and water supply pump control/scheduling function
based on these variables.
|
| ¡¤ |
In addition, optimal injection and control of coagulants ensures
efficient and cost effective coagulants injection plan in response to the
change of raw water quality. Facility management system provides accurate
facility information to reinforce maintenance system and assists the computerization
of clear water works by managing tasks efficiently through database formation
of clear water utilities. |
|
|
|